VolkerRail helped the North Yorkshire Moors Railway (NYMR) prepare a section of track in readiness for the arrival of the famous Flying Scotsman locomotive
Finished eight hours ahead of schedule, VolkerRail used its ALC switch and crossing plain line beaver tamper to successfully align a 200m section of track and levelled two switch and crossing assembly points, between Levisham and Pickering station.
VolkerRail helped the North Yorkshire Moors Railway (NYMR) prepare a section of track in readiness for the arrival of the...
VolkerRail’s Beaver tamper team has completed works at a new train carriage stable, located near Pickering station, in...