![powerpoint slide showing information in colour](/sites/vw_uk_rail/files/styles/content_keyvisual_parallax_xsmall/public/2024-06/VHOD-044.jpg?h=9855f42d&itok=QRbIKpTA)
Policies and procedures
VolkerRail’s Contractor Policy documents sets out the expectations of how we want to work together, to ensure our project risks are managed, monitored and controlled effectively using specific procedures that we own and manage.
We want to ensure that all our projects use the same detailed information, controls and permits to enable us and all our contract staff and subcontractors to work seamlessly together.
The Contractors Policy has detailed information, placed under specific subject headings, to assist in locating the areas and references for compliance. The procedures and policies referenced in that document are located here.
Please note: The information shared below is the property of VolkerRail and/or VolkerWessels UK and must not be distributed, edited, or used outside of its intended purposes.
- VolkerWessels UK Anti-Bribery and Corruption Policy
- VolkerWessels UK Drugs and Alcohol Policy
- VolkerWessels UK Integrity Policy
- VolkerWessels UK Whistleblowing Policy
- VolkerWessels UK Responsible Procurement Declaration
- VolkerWessels UK Confidentiality Statement
- VolkerWessels UK Fraud Policy
- VolkerWessels UK Safer Use of Mobile devices on Construction Sites
- VolkerWessels UK Fairness, Inclusion and Respect Policy
- VolkerWessels UK Modern Slavery Policy
- VolkerRail Health, Safety and Wellbeing Policy Statement
- VolkerRail Environmental & Social Value Policy Statement
- VolkerRail Quality and Systems Policy Statement
- VolkerRail Fatigue Risk Management Policy Statement
- VolkerRail Drugs, Alcohol and Medication Policy Statement
- SAF04 – Reporting and Investigation
- SAF06 – Fatigue Risk Management
- SAF16 – Drugs, Alcohol and Medication
- SAF19 – Safety of People Working On or Near the Line
- SAF23 – Site Management (Incl. Site Set-up, Deliveries, Collection and Demobilisation)
- SAF25 – Worksafe Procedure
- SAF26 – Personal Protective Equipment
- SAF30 – Risk Assessment
- SAF64 – Confined Space Entry and Working
- SAF88 – Working at Height
- OHS02 - Control of Vibration at Work
Plant
- PE312 – Control, Safe Use and Operation of Abrasive Wheels, Disc Cutters and Grinders
- PE321 – Operational & Engineering Arrangements for the use of the Kirow Cranes within Possessions
- PE323 – Avoidance of Danger from Overhead Power Lines
- PE326 – Vehicular Plant and Crane Operations
- PE348 – Use of Wacker Plates
- PE349 – Safe Use of Ironmen and Similar Manually Operated Lifting Devices
- PE350 – Beaver Tamper Access Arrangements and Protection of The Infrastructure
- PE353 – Re Railing Procedure using MFD Lifting Jacks
- SAF28 – Restricted Tools
Environment
- ENV01 – Environment and Social Value Manual
- ENV04 – Project Management and the Environment
- ENV05 – Waste Management
- E04 – Waste Management (VWUK)
- ENV06 – Control of Noise, Vibration and Nuisances
- ENV07 – Pollution Prevention
- ENV08 – Management of Environment Incidents
- ENV09 – Management of Protected Sites and Species